Skip to main content
XYZ Agency

How much does it cost to build an MVP in 2026?

By the XYZ Agency team, updated on

The cost of an MVP depends on three things: the scope, the number of platforms and who builds it. So there is no single price, but you can know what pushes the bill up or down before you ask for a quote. At XYZ Agency an MVP is delivered in 2 weeks and the quote is precise, given after a first conversation.

What really drives the price

Two MVPs that look alike on screen can have very different prices. The gap almost always comes from the same items.

  • Scope: every extra flow (referrals, messaging, advanced admin) adds time. It is the first lever, and the only one fully in your hands.
  • Platforms: web only, iOS and Android, or all three. A shared codebase (React Native, Flutter) avoids paying for mobile twice.
  • Integrations: payments, AI, third-party services. Each one needs wiring and testing.
  • Level of finish: careful design and production-ready code cost more than a prototype, and save you from rebuilding at the first customer.
  • Billing model: on time and materials, the budget moves with surprises. With a firm quote, you know it before you start.

How an MVP quote is built

A serious quote starts from what the product must do on launch day, not from a number of days. Here is what we look at before pricing, and what you can prepare to get a precise price the first time.

ItemWhat pushes the price upHow to contain it
FlowsSeveral complete flows in the first versionA single flow, from sign-up to payment
PlatformsWeb, iOS and Android built separatelyOne starting platform, or a shared codebase for mobile
PaymentsSeveral plans, trials, promo codes, custom invoicesOne simple plan at launch
AI and integrationsEvery third-party service to wire in and testKeep the ones the product cannot work without
AdminA full dashboard for the teamThe bare minimum, the rest later

At XYZ Agency this scoping happens on WhatsApp or on a call. You then get a precise quote for an MVP delivered in 2 weeks, and the product grows through 2-week sprints with no commitment: you stop or pause whenever you want. What is delivered is detailed on the MVP development agency page.

Be wary of both extremes. A price given without a single question about your product will be renegotiated along the way. A time-and-materials quote with no cap lets the budget follow every surprise. Always ask what is included: design, release, post-launch support.

What to budget on top of development

  • Developer accounts: the Apple Developer Program costs 99 USD per year, Google Play Console registration is a one-time 25 USD (checked on the official pages on 11 November 2026).
  • Payment fees: Stripe, like the App Store and Google Play, takes a commission on each sale. It depends on the country and the payment method.
  • Hosting and services: server, database, email, and AI API calls if the product uses them. These costs follow usage: low at launch, rising with the number of users.
  • Acquisition: an MVP with no visitors validates nothing. Plan a budget or time to get the product known.

How to lower the bill without hurting the product

  1. Write the promise in one sentence. Anything that does not serve it leaves the MVP.
  2. Keep a single flow, from sign-up to payment.
  3. Pick one starting platform, the one where your users are.
  4. Push the rest into sprints, decided after the first feedback.

If you already have a prototype built with AI tools, it can serve as a base: see AI app rescue.

Frequently asked questions

How much does an MVP cost at XYZ Agency?

It depends on the scope of your product. After a first conversation, on WhatsApp or on a call, you get a precise quote for an MVP delivered in 2 weeks and released on the web, the App Store or Google Play.

Does a mobile app MVP cost more than a web MVP?

Not necessarily. With a shared codebase (React Native or Flutter), iOS and Android are built together. Store fees come on top, paid directly to Apple and Google.

What happens after the MVP?

The product grows through 2-week sprints, driven by user feedback. There is no commitment: you stop or pause whenever you want.

Sources

Let's talk about your project

Send us your idea on WhatsApp. You leave with a scope, a timeline and a quote.